Airport Link, Bowen Hills

Client: Theiss, John Holland
Location: Bowen Hills

The construction of the low point sump, approximately 25m x 20m and walls of 7.6m in height.

Also the construction of Reinforced Concrete Walls, Lining the Tunnels over the TBM Burial Chambers.